|
|
|
|
|
| |
|
|
| |
|
Desai Construction Pvt. Ltd. uses the best of construction and transport equipments that are most modern, efficient and well maintained.
A separate division looks after this particular aspect ensuring timely schedules for despatch of machinery at site and on completion, the return of the same with least or no damage.
Our workshop takes care of ensuring the machinery and equipment in fighting fit condition at all times. The range of our equipment and services is sought by our clients and envied by our competitors. |
| |
| |
|
|
| |
| |
SHUTTERING AND SCAFOLDING MATERIALS: |
| |
Details of Equipment |
No. of Units |
Make |
|
Slab Form Plates (Steel) |
35,000 M2 |
|
|
Wall Form |
25,000 M2 |
|
|
Column Plates (Steel) |
7500 M2 |
|
|
Beam Plates (Steel) |
6000 Nos |
|
|
Steel Adjustable Props |
29000 M2 |
|
|
Steel Floor Span |
6763 Nos |
|
 |
Steel H Frame |
7500 Nos |
|
 |
Vertical Pipe with Cuplock System |
25000 M³ |
|
 |
M S Pipes |
45000 Nos |
|
 |
M S Coupler |
1,00,000 Nos |
|
 |
Crip |
1500 Nos |
|
|
| |
|
|
|
|
|
|